Welcome!
Welcome to the Marin Software Support Center. We're glad you're here. Here's what you can look forward to:
  • Real-time search so you can find what you need faster than ever.
  • Easy-to-follow video guides for our most popular articles.
  • Interactive simulations and Live Screenshots to make learning easy.
  • Regular content updates to ensure every word you read is accurate and up-to-date.

Revenue and Conversion Tracking

Home > English > Revenue and Conversion Tracking > Tracking IDs & Parameters > How To Articles: Tracking IDs & Parameters > Rebuilding URLs After Adding New Tracking Parameters

Rebuilding URLs After Adding New Tracking Parameters

Introduction

If you are not using URL redirects, or you're using the platform tracking pixel, there may be times when you want to add specific tracking parameters to your destination URLs. You can do this by adding the new parameters to the URL Parameters tab and the Custom Parameters tab of the URL Builder. For more information, read An In-Depth Guide to New URL Builder (Google Only).

How to rebuild URLs once parameters are added (Keywords)

Follow these steps for Keywords. Once your parameters are added to the URL Builder settings, you'll need to re-traffic these URLs to append all of your destination URLs. Here's how to do it.

  1. Go to the main Keywords tab and use the View Builder to add the following columns: Account, Campaign, Group, Match Type, Status, and Destination URL.
     
  2. Use the filters in the lower left to filter for the appropriate publisher.
     
  3. Click the Create Report link in the upper right of the grid.
     
  4. Select One-time and check the Include items with zero clicks box, then click Continue.
     
  5. Click the Completed reports link and download the processed report, but do not open it directly in Microsoft Excel.
     
  6. Import the report as UTF-8 text by using Excel's Import from text option.
     
  7. Sort the data by Status and remove all of the deleted keywords, if present.
     
  8. In the Destination URL column, strip out all of the existing parameters leaving only the base URL. (Parameters will usually start with &mkwid).
     
  9. Once you've cleaned the destination URLs, save the file as Unicode text and then split it (if necessary) into files smaller than 100K rows. You can use CSV Splitter or similar to achieve this. Splitting the file in this way will make the upload process much quicker.
     
  10. Upload your completed files back to the platform using the bulk add/edit function in the Keywords tab.
     
  11. Go to the Activity Log to check the status of your uploaded files. Once complete, double-check that the destination URLs in the Keywords tab have been appended correctly.
     
  12. Finally, push all of the To be sent jobs to the publisher via the Activity Log.

How to rebuild URLs once parameters are added (Creatives)

Follow these steps for Creatives. Once your parameters are added to the URL Builder settings, you'll need to re-traffic these URLs to append all of your destination URLs. Here's how to do it.

  1. Go to the main Creatives tab and use the View Builder to add the following columns: Account, Campaign, Creative ID, Group, Status, and Destination URL.
     
  2. Use the filters in the lower left to filter for the appropriate publisher.
     
  3. Click the Create Report link in the upper right of the grid.
     
  4. Select One-time and check the Include items with zero clicks box, then click Continue.
     
  5. Click the Completed reports link and download the processed report, but do not open it directly in Microsoft Excel.
     
  6. Import the report as UTF-8 text by using Excel's Import from text option.
     
  7. Sort the data by Status and remove all of the deleted creatives, if present.
     
  8. In the Destination URL column, strip out all of the existing parameters leaving only the base URL. (Parameters will usually start with &mkwid).
     
  9. Once you've cleaned the destination URLs, save the file as Unicode text and then split it (if necessary) into files smaller than 100K rows. You can use CSV Splitter or similar to achieve this. Splitting the file in this way will make the upload process much quicker.
     
  10. Upload your completed files back to the platform using the bulk add/edit function in the Creatives tab.
     
  11. Go to the Activity Log to check the status of your uploaded files. Once complete, double-check that the destination URLs in the Creatives tab have been appended correctly.
     
  12. Finally, push all of the To be sent jobs to the publisher via the Activity Log.


 

 

Last modified

Tags

Classifications

(not set)
(not set)
(not set)

 

wiki.page("Internal/Mindtouch_Launch_Sandbox/js.cookie.js")